Notice on Full Survey of Total Labor Costs for Design Development Specialized Personnel (H2)
- Deadline
- Closed
A full survey is conducted to assess total labor costs for specialized personnel in design development projects. Institutions must submit updated career periods and related documents by July 2026; failure to respond will result in the inability to settle future service payments.
3-second summary
- Target: Registered performing institutions in the design development field as of July 2026
- Deadline: Until 2026.07.29
- Required Documents: Total labor cost calculation sheet, career description, design specialist confirmation, new H2 career proof
- Note: Failure to respond results in inability to settle future services
Schedule & how to apply
- Deadline: 2026.07.29
- Application Method: Email submission (export@kidp.or.kr)
Recommended for
- Essential notice for managers at design development performing institutions preparing for H2 2026 labor cost settlements.
Frequently asked questions
How do I apply?
Applications follow the official program notice, which is in Korean. See the source link for the method and receiving office; Beaconoi can prepare an English draft for your review.
Last updated · Source: official program notice
※ Program information is compiled from each institution’s public sources; actual eligibility, amounts and deadlines may change. Always verify against the official notice (in Korean) before applying.